Refrigeration

refrigeration rsw 1

This project demonstrates the Rzoska team's dedication to service.

Notice of this project was received a week prior to Christmas with delivery by mid January.

The new plant upgrades required system design and function description in collaboration with the refrigeration engineers. A plant and equipment purchase schedule was produced prior to the wholesalers Christmas shutdown, drawings were produced, control cabinets and equipment produced and PLC codes developed.

Immediately following the vessels arrival in port the team was required to collaborate with other contractors to manage the instillation of control cabinets, cabling and interface connection before departure.

 